Plant Fibre Link & Rack Installation
Network job for SML's new P-3 Domino machine at Panoli Unit-II: Gigabit switches with single-mode SFPs, fibre termination units, splicing and a dressed 6U wall rack connecting the machine to the plant network.
- Client
- SML Limited
- Industry
- Agrochemicals
- Site
- Panoli Unit-II, Ankleshwar
- Period
- POs dated 3 Feb 2023
- Practice
- Network & IT infrastructure
The full write-up and PDF can be requested by email from the case studies page.

- Switches
- 2 × Gigabit
- Optics
- 2 × SM SFP
- Rack
- 6U wall
- Orders
- 3 Feb 2023
More network & IT infrastructure projects
- Jindal TextilesIndustrial Connectivity · Interface Selection & Validation
- Toyo Ink India Pvt. Ltd.Plant Network, CCTV & Wi-Fi · Smart-Meter Fibre Link
- Shroff S. R. Rotary Institute of Chemical TechnologyDell Desktops, Laptop & Printers with Warranty
- Element Chemilink Pvt. Ltd.Network, Matrix EPABX & Hikvision CCTV
Planning something similar at your plant?
Tell us about your site. An engineer will call you back within one business day.
