Plant Fibre Link & Rack Installation · Agrochemicals

Plant Fibre Link & Rack Installation

Network job for SML's new P-3 Domino machine at Panoli Unit-II: Gigabit switches with single-mode SFPs, fibre termination units, splicing and a dressed 6U wall rack connecting the machine to the plant network.

Client
SML Limited
Industry
Agrochemicals
Site
Panoli Unit-II, Ankleshwar
Period
POs dated 3 Feb 2023
Practice
Network & IT infrastructure

The full write-up and PDF can be requested by email from the case studies page.

Switches
2 × Gigabit
Optics
2 × SM SFP
Rack
6U wall
Orders
3 Feb 2023