MRF Limited
Industrial IT/OT Network & FMS · Automotive Tyre Manufacturing
Industrial IT/OT Network & FMS
Plant network transformation at MRF Dahej — 25.3 km single-mode fibre, 33.5 km shielded copper and 51 core + access switches engineered as one resilient voice, data and industrial foundation, supported through seven years of network FMS.
- Client
- MRF Limited
- Industry
- Automotive Tyre Manufacturing
- Site
- MRF Dahej
- Period
- Greenfield build → 7 years FMS
- Practice
- Network & IT infrastructure
The full write-up and PDF are emailed to you from the case studies page.
- Fibre
- 25.3 km SM
- Copper
- 33.5 km
- Switches
- 51
- FMS
- 7 Years
Planning something similar at your plant?
Tell us about your site. An engineer will call you back within one business day.
